Talk to us
HL7 · FHIR · HIPAA · Cloud

Health IT,
engineered for
zero downtime.

Migrations, interfaces and managed operations for hospitals, practices and healthcare vendors — delivered by one accountable team.

Scroll
24/7
Monitored operations
NOC coverage
<1d
Quote turnaround
Business day
0
Clinic-hours lost at cutover
Target, every migration
2
Practices, one team
Clinical + digital
02 — Interoperability

One interface layer.
Every system downstream.

Sources normalised once, then delivered everywhere they're needed — with delivery you can audit.

Sources
Legacy EHRHL7 v2
Reference labORU^R01
Imaging / PACSDICOM
Patient intakeFHIR R4
ClearinghouseX12 835
Interface engine
Interface EngineHealthy
ADT_INBOUND_01412/hr
LAB_RESULTS_02188/hr
CLAIMS_OUT_0396/hr
SCHED_SYNC_04540/hr
99.98%Delivery
41msMedian hop
0Stuck msgs
Destinations
Cloud EHRFHIR R4
Billing / RCMX12 837
Analytics storeParquet
Patient portalREST
Audit archiveWORM
System vitalsSample telemetry · placeholder
Uptime · 90d99.99%
Message error rate0.02%
Open P1 incidents0
Mean response11m
Client logos — placeholder, drop real marks here
04 — Method

Fixed phases.
Written exit criteria.

One accountable lead from assessment to steady state. No phase closes until its criteria are signed.

01

Assessment

1–2 weeks

Systems inventory, interviews, risk register and a written scope.

Exit: Signed scope and fixed quote
02

Design

2–4 weeks

Target architecture, mapping specs, cutover and rollback plans.

Exit: Approved design package
03

Build

4–10 weeks

Pipelines, interfaces and environments built against the spec.

Exit: Validated test environment
04

Cutover

1 weekend

Rehearsed switch with reconciliation and on-site or on-call support.

Exit: Counts reconciled, sign-off
05

Operate

Ongoing

Monitoring, support and quarterly review against agreed SLAs.

Exit: Quarterly service report
06

Optimize

Quarterly

Performance tuning, workflow cleanup and cost review against real usage.

Exit: Measured gain, agreed backlog

HIPAA alignment

BAAs in place, minimum-necessary access, documented safeguards.

Change control

Every production change ticketed, reviewed and reversible.

Audit evidence

Logs and reconciliation artifacts handed over at close.

Vendor coordination

We hold the calls with your EHR and clearinghouse vendors.

03 — Migration engine

Records move once.
Clinicians never wait.

01
Extract
Read-only pull from legacy system with row counts frozen.
Source
02
Normalize
Field mapping to target schema, terminology cross-walked.
Map
03
Validate
Clinician-reviewed sample sets plus automated diffs.
QA
04
Cutover
Rehearsed switch inside a scheduled window, rollback ready.
Go-live
0
Records reconciled
Sample telemetry · placeholder

Scope your project
in one call.

Send the systems you run and the outcome you need. You get a fixed-scope quote and a named engineer.